Pushing the limits of two men, my brother and I are doing what your great grandparents did... build a home with our own two hands... I mean with four hands, two hands from him and two hands from me.
Little bro is installing Hardibacker, note that the ceiling will recieve tile as well.
Shower pan goes down before Hardibacker is installed on lower walls. There is to be no penetration of this membrane from the floor to six inches above the floor.
Now you throw some Quikrete Sand Mix in the bottom. Float out at 1/2 to 1/4 bubble, sloped to drain. This is actually difficult. I think this is the first shower that I have floated correctly. I usually make them too steep. A level and a chalk line on the Hardibacker before you place the sand mix helps out tons.
Slate 12 x 12 squares, pretty typical and simple. Note the leg shaving bench on the right.


Two blog posts in one day! I know you feel really lucky, kind of like when you order a nine peice chicken nugget at Mickey D's and they give you ten. Our garage gets used and abused. There has been a couple wrecked Duramax trucks that have been rebuilt in there, two wrecked snowmobiles that were rebuilt, and two cats that left hair balls and poo everywhere. So I cleaned her out and hired my friend Ben to epoxy coat the floor. The first pic is what it was like last week, notice all the oil spots and junk littering the edges. The second pic is after I cleaned her up and Ben etched the floor with muratic acid and a grinder. The third pic is the tan, epoxy base coat cover with four different colored flakes and then a urethane coating on the top. I'll be able to park in there five days after the urethane coat was applied. This stuff costs a ton, but it will make the garage so much nicer to work in. Imagine your bedroom without carpet. That's how I use to feel everytime I pulled into my garage. My truck will be so much happier. 
We are moving right along with the basement finish now. We were able to hire some Latinos to do the drywall mud and texture. It looks great and it didn't cost very much. With the current market, people are desperate for work. My money goes almost twice as far as it did a year ago. Last year I bought electrical wire for about 70 dollars a roll. You can buy that same roll for just over 30 bucks these days. My advise for the current market, buy, buy, buy! (Don't go into debt though, small note most have forgotten).


I've been keeping busy over the last couple months. I half way finished a brick mailbox (that's how we like it in Kentucky), finished the mechanical, electrical, and plumbing in the basement, and even built a work area in my furnace room. That would be the last picture on this post. Those cabinets are high quality, straight from China, free ninty-nine cabinets. The countertop was free too. 